Skip to content

Hull · Yorkshire

Industrial Packaging Hull — ISPM-15 Export Crates, Foam Inserts & Heat-Treated Timber

Export-grade industrial packaging, crates, foam inserts and case-line kitting across Hull and Yorkshire.

Looking for industrial packaging in Hull? Kentron Group designs, manufactures and installs industrial packaging across Hull and the surrounding Yorkshire, with a dedicated operations team working the Humber ports corridor. Our engineers are SEMA-approved and every installation is delivered by SSIP-certified crews under CDM 2015, so whether you operate a single offshore wind export unit or a network of regional hubs, you get calculated drawings, FEM/EN-compliant steelwork and an installation programme that respects your shift patterns. Typical lead time from survey to handover for projects in the HU1, HU2, HU7, HU9, HU12, HU13 postcodes is four to eight weeks.

  • ISPM-15 heat-treated timber, HT/DB-stamped and FC-registered (UK/XXXX)
  • SSIP-certified installation crews mobilised from our Hull & Humber operations hub
  • Full coverage of HU1, HU2, HU7, HU9, HU12, HU13 with free pre-survey within 10 working days
  • ATA/CITES compliant documentation for airfreight and dangerous goods
  • Dedicated project manager and single point of accountability for the whole programme
  • Post-installation SEMA-approved inspection available as a 12-month contract

Why Hull operators choose Kentron for industrial packaging

Hull and the wider Yorkshire economy is built on offshore wind export, and the Humber ports corridor is one of the busiest freight routes in the UK. That puts unusual demand on any industrial packaging installation: shift patterns are compressed, delivery windows are tight, and a single day of disruption across a DC floor can ripple through hundreds of downstream orders. Our model is built around that reality — we survey, calculate, manufacture and install as a single accountable team, so you don’t inherit the risk of a design studio that hands off to a sub-contracted fit-out crew.

Most of our Hull programmes run on nights and weekends. We stage steel at our Hull & Humber operations hub and convoy to site so there is no multi-day laydown in your yard. Every lift, bolt and fixing is tracked against the approved drawings and signed off by a SEMA-approved supervisor before the crew demobilises.

Postcode coverage — HU1 to HU13

We actively cover the following Hull and Yorkshire postcodes: HU1, HU2, HU7, HU9, HU12, HU13. Nearby areas regularly served from the same crew rotation include Beverley, Hessle, Immingham and Goole. If your site sits outside this cluster but within the wider Yorkshire catchment, we still mobilise — it simply adds one working day to the survey lead time.

What is included in a Hull industrial packaging project

  • Site survey — measured floor plan, slab levels, fire-zone overlay and MHE audit, signed by a SEMA-approved surveyor.
  • Engineering pack — elevation and plan drawings, stamped load calculations to FEM 10.2.02 / EN 15512 (or the family-equivalent standard), and a written Basis of Design.
  • Manufacturing programme — ISO 9001 steelwork with individual component traceability, batched against your install window.
  • Installation — SSIP-certified crews under CDM 2015 with RAMS, site inductions and a lifting plan.
  • Handover pack — approved as-built drawings, operator load notices, inspector sign-off and a 12-month SEMA-approved inspection option.

Sectors we deliver for in Hull

Across Yorkshire we have delivered for third-party logistics providers, cold-chain operators, automotive parts distributors, pharma fulfilment centres, retail DCs, MOD contractors and construction principal contractors. The common thread is that each project is engineered to a measured load case — we do not sell a catalogue product with a generic capacity sticker. Your industrial packaging is rated to your pallets, your MHE lift heights, your aisle widths and your regional seismic / snow load assumptions.

Compliance and accreditations

Kentron is a member of SEMA (Storage Equipment Manufacturers Association), operates under ISO 9001 and ISO 14001, and is registered with CHAS, SafeContractor and Constructionline. Every project carries the documentation your insurer, auditor and HSE inspector will ask for — before, during and after handover.

Typical Hull lead times

From first site survey to operational handover we target 4–8 weeks for stock-line industrial packaging in Hull, and 8–14 weeks for bespoke or high-load configurations that require a longer manufacturing window. Where a programme is genuinely urgent (insurance reinstatement, peak-season reconfiguration) we have run accelerated jobs inside 14 days using staged deliveries and split shift installation.

See the full product family

Industrial Packaging

ISPM-15 export crates, custom foam inserts and heavy-duty shipping cases engineered for long-haul protection of industrial assets.

View the full range

Ready to start?

Our engineers respond within one business day.

Book a free Hull site survey

Frequently asked questions

Yes. The majority of our Hull programmes run on nights, weekends or phased shutdowns. We stage steel at our operations hub and convoy to site, so there is no extended laydown in your yard and your daytime pick operation continues uninterrupted.
Our core coverage for Hull includes HU1, HU2, HU7, HU9, HU12, HU13. Outside these postcodes but within the Yorkshire catchment we still mobilise from the same crew rotation; a small travel-time allowance applies.
A SEMA-approved surveyor is booked within 10 working days of a signed enquiry, and we can expedite to 48 hours for insurance reinstatement or post-damage rebuilds. The survey itself takes 2–4 hours on an average DC floor.
Yes. Kentron is a SEMA member (Storage Equipment Manufacturers Association), designs to FEM 10.2.02 / EN 15512 (or the family-equivalent standard) and can provide SEMA-approved inspection on a 12-month contract after handover. Every installation is delivered by SSIP-certified crews under CDM 2015.
We handle the whole project as a single accountable contract: survey, calculations, manufacturing, delivery, installation, sign-off and post-handover inspection. You get one project manager and one point of contact, not a chain of sub-contractors.