Skip to content

Leicester · East Midlands

Modular Buildings Leicester — CE-Marked Modular Buildings, Delivered in Weeks

Welfare cabins, offices, classrooms and hybrid modular structures across Leicester and East Midlands.

Looking for modular buildings in Leicester? Kentron Group designs, manufactures and installs modular buildings across Leicester and the surrounding East Midlands, with a dedicated operations team working the M1 J21 corridor. Our engineers are SEMA-approved and every installation is delivered by SSIP-certified crews under CDM 2015, so whether you operate a single textiles & food unit or a network of regional hubs, you get calculated drawings, FEM/EN-compliant steelwork and an installation programme that respects your shift patterns. Typical lead time from survey to handover for projects in the LE1, LE3, LE4, LE7, LE19, LE65 postcodes is four to eight weeks.

  • Steel-framed, CE-marked modules engineered to BS EN 1090 Execution Class 2
  • SSIP-certified installation crews mobilised from our Leicester operations hub
  • Full coverage of LE1, LE3, LE4, LE7, LE19, LE65 with free pre-survey within 10 working days
  • Compliant with Building Regulations Part L, M, B and accessibility standards
  • Dedicated project manager and single point of accountability for the whole programme
  • Post-installation SEMA-approved inspection available as a 12-month contract

Why Leicester operators choose Kentron for modular buildings

Leicester and the wider East Midlands economy is built on textiles & food, and the M1 J21 corridor is one of the busiest freight routes in the UK. That puts unusual demand on any modular buildings installation: shift patterns are compressed, delivery windows are tight, and a single day of disruption across a DC floor can ripple through hundreds of downstream orders. Our model is built around that reality — we survey, calculate, manufacture and install as a single accountable team, so you don’t inherit the risk of a design studio that hands off to a sub-contracted fit-out crew.

Most of our Leicester programmes run on nights and weekends. We stage steel at our Leicester operations hub and convoy to site so there is no multi-day laydown in your yard. Every lift, bolt and fixing is tracked against the approved drawings and signed off by a SEMA-approved supervisor before the crew demobilises.

Postcode coverage — LE1 to LE65

We actively cover the following Leicester and East Midlands postcodes: LE1, LE3, LE4, LE7, LE19, LE65. Nearby areas regularly served from the same crew rotation include Loughborough, Hinckley, Coalville and Wigston. If your site sits outside this cluster but within the wider East Midlands catchment, we still mobilise — it simply adds one working day to the survey lead time.

What is included in a Leicester modular buildings project

  • Site survey — measured floor plan, slab levels, fire-zone overlay and MHE audit, signed by a SEMA-approved surveyor.
  • Engineering pack — elevation and plan drawings, stamped load calculations to FEM 10.2.02 / EN 15512 (or the family-equivalent standard), and a written Basis of Design.
  • Manufacturing programme — ISO 9001 steelwork with individual component traceability, batched against your install window.
  • Installation — SSIP-certified crews under CDM 2015 with RAMS, site inductions and a lifting plan.
  • Handover pack — approved as-built drawings, operator load notices, inspector sign-off and a 12-month SEMA-approved inspection option.

Sectors we deliver for in Leicester

Across East Midlands we have delivered for third-party logistics providers, cold-chain operators, automotive parts distributors, pharma fulfilment centres, retail DCs, MOD contractors and construction principal contractors. The common thread is that each project is engineered to a measured load case — we do not sell a catalogue product with a generic capacity sticker. Your modular buildings is rated to your pallets, your MHE lift heights, your aisle widths and your regional seismic / snow load assumptions.

Compliance and accreditations

Kentron is a member of SEMA (Storage Equipment Manufacturers Association), operates under ISO 9001 and ISO 14001, and is registered with CHAS, SafeContractor and Constructionline. Every project carries the documentation your insurer, auditor and HSE inspector will ask for — before, during and after handover.

Typical Leicester lead times

From first site survey to operational handover we target 4–8 weeks for stock-line modular buildings in Leicester, and 8–14 weeks for bespoke or high-load configurations that require a longer manufacturing window. Where a programme is genuinely urgent (insurance reinstatement, peak-season reconfiguration) we have run accelerated jobs inside 14 days using staged deliveries and split shift installation.

See the full product family

Modular Buildings

CE-marked modular offices, site accommodation, cleanrooms and multi-storey HQs — from single cabin to 5,000 m² turnkey structure.

View the full range

Ready to start?

Our engineers respond within one business day.

Book a free Leicester site survey

Frequently asked questions

Yes. The majority of our Leicester programmes run on nights, weekends or phased shutdowns. We stage steel at our operations hub and convoy to site, so there is no extended laydown in your yard and your daytime pick operation continues uninterrupted.
Our core coverage for Leicester includes LE1, LE3, LE4, LE7, LE19, LE65. Outside these postcodes but within the East Midlands catchment we still mobilise from the same crew rotation; a small travel-time allowance applies.
A SEMA-approved surveyor is booked within 10 working days of a signed enquiry, and we can expedite to 48 hours for insurance reinstatement or post-damage rebuilds. The survey itself takes 2–4 hours on an average DC floor.
Yes. Kentron is a SEMA member (Storage Equipment Manufacturers Association), designs to FEM 10.2.02 / EN 15512 (or the family-equivalent standard) and can provide SEMA-approved inspection on a 12-month contract after handover. Every installation is delivered by SSIP-certified crews under CDM 2015.
We handle the whole project as a single accountable contract: survey, calculations, manufacturing, delivery, installation, sign-off and post-handover inspection. You get one project manager and one point of contact, not a chain of sub-contractors.