Heathrow · Greater London
Warehouse Racking Heathrow — SEMA-Engineered Pallet Racking, Mezzanines & VNA
Pallet racking, drive-in, cantilever and mezzanine systems across Heathrow and Greater London.
Looking for warehouse racking in Heathrow? Kentron Group designs, manufactures and installs warehouse racking across Heathrow and the surrounding Greater London, with a dedicated operations team working the M4 / M25 corridor corridor. Our engineers are SEMA-approved and every installation is delivered by SSIP-certified crews under CDM 2015, so whether you operate a single airfreight & 3PL unit or a network of regional hubs, you get calculated drawings, FEM/EN-compliant steelwork and an installation programme that respects your shift patterns. Typical lead time from survey to handover for projects in the TW6, TW5, TW13, TW14, TW19, UB3, UB7, UB8 postcodes is four to eight weeks.
- FEM 10.2.02 / EN 15512 calculations, stamped by a chartered structural engineer
- SSIP-certified installation crews mobilised from our West London operations hub
- Full coverage of TW6, TW5, TW13, TW14, TW19, UB3, UB7, UB8 with free pre-survey within 10 working days
- Compliant with PAS 1032, HSG76 and the latest SEMA Code of Practice
- Dedicated project manager and single point of accountability for the whole programme
- Post-installation SEMA-approved inspection available as a 12-month contract
Why Heathrow operators choose Kentron for warehouse racking
Heathrow and the wider Greater London economy is built on airfreight & 3PL, and the M4 / M25 corridor corridor is one of the busiest freight routes in the UK. That puts unusual demand on any warehouse racking installation: shift patterns are compressed, delivery windows are tight, and a single day of disruption across a DC floor can ripple through hundreds of downstream orders. Our model is built around that reality — we survey, calculate, manufacture and install as a single accountable team, so you don’t inherit the risk of a design studio that hands off to a sub-contracted fit-out crew.
Most of our Heathrow programmes run on nights and weekends. We stage steel at our West London operations hub and convoy to site so there is no multi-day laydown in your yard. Every lift, bolt and fixing is tracked against the approved drawings and signed off by a SEMA-approved supervisor before the crew demobilises.
Postcode coverage — TW6 to UB8
We actively cover the following Heathrow and Greater London postcodes: TW6, TW5, TW13, TW14, TW19, UB3, UB7, UB8. Nearby areas regularly served from the same crew rotation include Hounslow, Staines, Feltham, Hayes, Slough and West Drayton. If your site sits outside this cluster but within the wider Greater London catchment, we still mobilise — it simply adds one working day to the survey lead time.
What is included in a Heathrow warehouse racking project
- Site survey — measured floor plan, slab levels, fire-zone overlay and MHE audit, signed by a SEMA-approved surveyor.
- Engineering pack — elevation and plan drawings, stamped load calculations to FEM 10.2.02 / EN 15512 (or the family-equivalent standard), and a written Basis of Design.
- Manufacturing programme — ISO 9001 steelwork with individual component traceability, batched against your install window.
- Installation — SSIP-certified crews under CDM 2015 with RAMS, site inductions and a lifting plan.
- Handover pack — approved as-built drawings, operator load notices, inspector sign-off and a 12-month SEMA-approved inspection option.
Sectors we deliver for in Heathrow
Across Greater London we have delivered for third-party logistics providers, cold-chain operators, automotive parts distributors, pharma fulfilment centres, retail DCs, MOD contractors and construction principal contractors. The common thread is that each project is engineered to a measured load case — we do not sell a catalogue product with a generic capacity sticker. Your warehouse racking is rated to your pallets, your MHE lift heights, your aisle widths and your regional seismic / snow load assumptions.
Compliance and accreditations
Kentron is a member of SEMA (Storage Equipment Manufacturers Association), operates under ISO 9001 and ISO 14001, and is registered with CHAS, SafeContractor and Constructionline. Every project carries the documentation your insurer, auditor and HSE inspector will ask for — before, during and after handover.
Typical Heathrow lead times
From first site survey to operational handover we target 4–8 weeks for stock-line warehouse racking in Heathrow, and 8–14 weeks for bespoke or high-load configurations that require a longer manufacturing window. Where a programme is genuinely urgent (insurance reinstatement, peak-season reconfiguration) we have run accelerated jobs inside 14 days using staged deliveries and split shift installation.
See the full product family
Warehouse Racking
Warehouse racking systems manufacturer — pallet racking, drive-in, push-back, pallet flow, cantilever, mezzanine, narrow-aisle, cold room, tyre, stainless and custom systems. Designed, calculated, manufactured and installed by Kentron Group.
View the full rangeReady to start?
Our engineers respond within one business day.