Skip to content

Industry

Construction

Kentron supplies construction sites, principal contractors and fit-out specialists with modular site accommodation, secure tool and material stores, and temporary works structures. Every delivery arrives fully documented, CDM-aligned and ready to install inside a live programme.

Challenges

Where operators get stuck.

  • 01 Rapid deployment of secure, heated, insulated site offices.
  • 02 CDM 2015 documentation for every temporary works structure.
  • 03 Tool and consumables stores designed to deter site theft.
  • 04 Modular welfare and canteen units for multi-shift crews.
  • 05 Re-locatable storage to follow the programme between phases.
  • 06 Material segregation and environmental spill containment.
Our approach

How Kentron solves them.

  • Modular site offices, welfare and canteens with 5-day deployment SLAs.
  • Full CDM 2015 design, installation and maintenance documentation.
  • Lockable container-grade tool and consumables stores.
  • Chilled and heated welfare units with Part L-aligned envelopes.
  • Bolted modular structures re-locatable between phases with no write-off.
  • Spill-containment flooring and segregated storage for hazardous materials.
Get in touch

Ready to engineer your next project?

Spill-containment flooring and segregated storage for hazardous materials.