Meridian Pharma — Modular GMP Office
Client
Meridian Pharmaceuticals
Location
Manchester, United Kingdom
Completed
Oct 2025
Scale
1,200 m²
Industry
Pharma & Healthcare
Duration
8 weeks
Where the client got stuck.
Meridian Pharma needed a new GMP-compliant production support hub inside a live plant without disrupting their 24/5 manufacturing line. A brick-and-mortar build would have taken 14+ months with a full shutdown. MHRA validation of every surface, airlock and utility was non-negotiable.
How Kentron delivered.
Kentron delivered a bolted modular envelope with pre-validated finishes, HVAC, BMS and airlock sequencing. Installation happened inside a live factory on night shifts and weekends. A full commissioning pack — including IQ/OQ test scripts — was issued with the hand-over.
The measurable outcome.
Programme delivered in 16 weeks with zero production hours lost. MHRA inspection cleared the facility inside 90 days of hand-over. Meridian has since commissioned a sister site under the same framework.